Fragmented SCADA infrastructure across multiple distribution zones with no unified operational picture. Outage response was manual, slow, and dependent on field teams with no real-time visibility from a central control point.
"On-site deployment and configuration of MCC and BCC infrastructure, IED commissioning, network setup, point list import, and operator training across all three cities."
The implementation of Action.NET has transformed how our operators manage the distribution network. For the first time, our control room has a real-time picture of all three zones in one place — outage response is faster and our teams are more confident.
Chief Engineer
Uttarakhand Power Corporation
NKS Systems
Philippines / India
Certified Spin system integrator
partner
Verified Partner
SCADA
FLISR
Distribution
DISCOM
India
Multi-city
Control Center
Ready to license the right software?
Whether you're an integrator evaluating platforms or a utility specifying your next control system - let's talk.